NavalBrain
Book a call (opens in a new tab)
Book a call (opens in a new tab)

NavalRetrofit.

Models retrofit ROI.

Fit the upgrades that pay back. Skip the rest.

The problem. Every maker promises big savings. A wrong retrofit costs capital, dry-dock time and years of regret.

  • Each option simulated on your vessel and her real trades.
  • Fuel saved, payback, NPV and IRR, worst to best case.
  • Financial, compliance and technical approach.

How a candidate is evaluated.

NavalRetrofit pipeline: four candidates (Pre-swirl duct, Mewis duct, Rudder bulb and Scrubber) evaluated through Design, Physics, Capital and Regulatory stages. Pre-swirl duct is the winning recommendation; a 12-page NavalBrain report is produced as the deliverable.

From hull to capital.

Every candidate runs the same pipeline.

NavalRetrofit decision pipelineFour retrofit candidates feed one evaluation channel. As a travelling light passes the four stage boxes (Design, Physics, Capital, Regulatory), each lights up. After the sweep, three candidates are muted and the winner, Pre-swirl duct, emerges at the recommendation node, which is tethered by a dashed line to the generated NavalRetrofit report.Pre-swirl ductMewis ductRudder bulbScrubber01Design02Physics03Capital04RegulatoryEVALUATION COMPLETEDPre-swirl ductNAVALRETROFIT REPORTVESSELCapesize bulk, 170,913 DWT12 pages§ 03Resistance delta§ 08RECOMMENDATIONPROCEEDGENERATED REPORTDefensible across all four stages.Class society format.CFO-ready financials.Uncertainty bands disclosed.NavalRetrofit decision pipelineFour retrofit candidates feed one evaluation channel. As a travelling light passes the four stage boxes (Design, Physics, Capital, Regulatory), each lights up. After the sweep, three candidates are muted and the winner, Pre-swirl duct, emerges at the recommendation node, which is tethered by a dashed line to the generated NavalRetrofit report.Pre-swirl ductMewis ductRudder bulbScrubber01Design02Physics03Capital04RegulatoryEVALUATION COMPLETEDPre-swirl ductNAVALRETROFIT REPORTVESSELCapesize bulk, 170,913 DWT12 pages§ 03Resistance delta§ 08RECOMMENDATIONPROCEEDGENERATED REPORTDefensible across all four stages.Class society format.CFO-ready financials.Uncertainty bands disclosed.
01Design
Geometry, materials, install window.
02Physics
Resistance & propulsion delta, with confidence bands.
03Capital
The capital cost against the fuel it saves.
04Regulatory
CII, EEXI, FuelEU Maritime, ETS exposure.

A candidate can win on physics and still lose on capital or on regulation, which is why every stage is reported rather than folded into a single score. The baseline is what the vessel did when it was clean, from sea-trial data analysed under ISO 15016. “Class society format” describes how the report is laid out: NavalBrain is not affiliated with, approved by or certified by any classification society.

Where this sits.

The products are grouped as Diagnose (NavalBurn and NavalHull), Prescribe (NavalRetrofit, NavalDecide and NavalRoute) and Report (NavalReport). NavalRetrofit is in Prescribe: it tests what a retrofit would do and whether the capital pays back.

  • NavalBurn

    Analyzes fuel consumption.

    It separates the day's burn into its seven physical causes. A retrofit proposal is an argument about some of them.

  • NavalHull

    Computes and forecasts hull efficiency.

    Hull fouling is one of those seven causes, and it is tracked there, aligned with ISO 19030, rather than here.

  • NavalDecide

    Recommends decisions and live standing orders.

    Recommendations and standing orders draw on every other product, NavalRetrofit among them, and each is explained in money, engineering and law.

See it on your own fleet.

Book a call (external site)Download the brochure (PDF, 2.9 MB)
  1. Share

    Noon reports and documents for two of your vessels.

  2. Baseline

    We build each vessel's performance baseline.

  3. Results

    Savings, risks and reports, per vessel, in euros.